The old mineral roof had perished allowing rain water to penetrate into the kitchen below. To rectify the problem we conducted the following;
Removal of the old roof, installing 18mm OSB boards, add grp trims and matting. Coat the roof with 2 layers of desmopol. Add new lead flashings to the peramiter of the roof. All waste material was removed from the site, this new roof comes with a 20 year guarantee.